Table 2 [Appendix 2]: Distribution of Increased Appropriation in first Five Years

Expenditure Category Major reasons for Increased cost
Naval Combat Forces The Canterbury is withdrawn in 2005, in the out-years savings are offset by upgrades to the Anzac Frigates.
Naval Support Forces Introduction of the Multi-Role Vessel and later replacement of Endeavour.
Naval Patrol Force Introduction of Inshore and offshore Patrol Vessels.
Land Combat Forces Increased personnel and life cycle costs of replacement equipments.
Special Forces Replacement equipments.
Air Patrol Forces Major platform upgrade and increases in support personnel and associated costs.
Fixed Wing Transport Forces Major platform upgrade and increases in support personnel and associated costs.
Rotary Wing Transport Forces Major platform replacement and increases in support personnel and associated costs.
NZDF Operational Capability Improvements in joint capability particularly in operational CIS.
HQNZDF Corporate Capability Expansion of corporate personnel and improvement of management systems.
NZDF Infrastructure Replacement and improved maintenance of the Defence Estate.
NZDF Pay Increases Implementation of the 2004/05 planned pay increase.
NZDF General Capability General increases in NZDF and Single Service Capability.
Reducing Depreciation Baseline Source of funding from the annual reduction in baseline depreciation that occurs due to existing assets being withdrawn from service.
Asset Revaluation after 5 years The treatment of revaluation is to be reviewed after five years therefore the cost for the second five years is included.